Hydel

                                                                                         SRISAILAM RIGHT BANK POWER HOUSE (7X110 MW)

The 770 MW (7 x 110 MW) Srisailam Hydro Electric Project is constructed across the River Krishna, which is one of the major rivers of Peninsular India and a Power Station on the right side of the Dam.  The project site “Sunni Penta” of Kurnool District is 220 KMs from Hyderabad.  The project was executed in two stages.  The first stage included construction of the dam, water conductor system, power house and installation of 4 nos. 110 MW Hydro Generating Equipment.  The second stage envisaged installation of 3 more Generating units of 110 MW capacity.

 

Salient Features:

 

  1. Location          :  Sunnipenta, Srisailam Kurnool Dist. A.P.
  2. Category         :  Hydro Power Project 
  3. Capacity          :  7 x 110 MW  = 770 MW
  4. River                :  KRISHNA
  5. Dam                 :  Srisailam Dam, across Krishna River,  

       Kurnool District, Andhra Pradesh.

  1. Annual Energy Potential                    :  1752 MU
  2. Reservoir                                            :  Srisailam
  3. Catchment Area                                 :  2,03,597 Sq. K.M (79,530 Sq. Miles)
  4. Max. flood  discharge                         :  30,316 Cumecs
  5. Gross Storage                                    :  215.80 TMC Ft.
  6. Live Storage                                       :  186.83 TMC Ft.
  7. Dead Storage                                     :  28.97 TMC Ft.
  8. Generation per TMC                           :  5.5 MU
  9. Design Head                                       :  91.44 Mts.
  10. Max. gross head                                 :  104.85 Mts.
  11. Design Net Head                                :  91.44 Mts.
  12. Net Head Max/Min                              :  104.85 / 72.5 Mts.
  13. Full Reservoir level (FRL)                   : 885 Ft. (269.75 M)
  14. Min. Draw Down Level (MDDL)          : 800 Ft.
  15. Design Disch. through Machine          : 137.5 M3

 

 Commissioning details:

Unit – 1 :  30th August’ 1982

Unit – 2 :  14th December’ 1982

Unit – 3 :  19th November’ 1983

Unit – 4 :  27th August’ 1984

Unit – 5 :  31st March’ 1986

Unit – 6 :  30th October’ 1986

Unit – 7 :  19th March’ 1987

Technical:

  1.  TURBINE

             a)  Type                               : Francis RA  115/697 –VM - 3600

             b)  Make                              : BHEL

            c)  Design Net Head            : 91.44 Mts.

            d)  Rated Output                  : 112.2 MW

           e)  Output Max./ Min             : 123.5 MW/72.5 MW

           f)   Normal Speed                 : 187.5 RPM

          g)  Runway speed                 : 375 RPM

          h)  Disc. Through Machine    : 137.5 M3

 

2. GENERATOR

         a)  Type                   : SV 857 / 180 – 32 SUSPENSION

         b)  Make                  : BHEL

        c)  Rated Voltage     : 11000 V

        d)  Rated Out put      : 122000 KVA

        f)   Speed                 : 187.5 RPM

       g)  Power Factor        : 0.90 Lagging