2023-24:
A. Power Plants Performance Highlights:
|
B. PLF of Thermal stations:
|
C. Generation FY (2023-24):
|
Target (MU) |
Generation(MU) |
Achievement(%) |
|
|
Thermal |
26807.60 |
22460.63 |
83.78 |
|
Hydro |
3220.50 |
2006.38 |
62.30 |
|
Solar |
829.10 |
781.00 |
94.19 |
|
APGENCO |
30857.10 |
25630.39 |
83.06 |
-
The APGENCO&APPDCL Thermal stations achieved 59.98% PLF for the FY 2023-24
- APGENCO Supplied on Average 87.09 MU/Day to Grid during FY 2023-24
- APGENCO’s contribution to Grid is 40.43% during Fy 2023-24
***********************************************************************************************************************************************************
2022-23:
A. Power Plants Performance Highlights:
|
B. PLF of Thermal stations:
|
C. Generation:
|
Target (MU) |
Generation(MU) |
Achievement(%) |
|
|
Thermal |
22145.72 |
20436.90 |
92.28 |
|
Hydro |
3331.98 |
4294.93 |
128.90 |
|
Solar |
837.75 |
728.49 |
86.95 |
|
APGENCO |
26315.45 |
25460.32 |
96.75 |
- APGENCO Supplied on Average 81.70 MU/Day to Grid.
- APGENCO’s contribution to Grid is 41.46%.
***********************************************************************************************************************************************************
2. 2021-22:
A. Power Plants Performance Highlights:
|
B. PLF of APGENCO Thermal stations:
|
C. Generation:
|
Target (MU) |
Generation(MU) |
Achievement(%) |
|
|
Thermal |
24730.6 |
18407.28 |
74.43 |
|
Hydro |
3245.1 |
3741.90 |
115.30 |
|
Solar |
46.4 |
704.908 |
83.28 |
|
APGENCO |
28822.1 |
22858.73 |
79.30 |
- APGENCO Supplied on Average 72.85 MU/Day to Grid.
- APGENCO’s contribution to Grid is 38.94%.
*************************************************************************************************************************************************************
PERFORMANCE HIGHLIGHTS FOR 2020-21
- APGENCO has achieved annual generation of 14194.71 MU.
- Thermal power stations (Dr NTTS & RTPP) have achieved annual generation of 10610.06 MU.
- Thermal power station (Dr NTTPS & RTPP) have achieved a PLF of 35.52. The low generation & PLF were because of less demand in the grid due to COVID-19 PANDEMIC.
- Generation from Hydro power stations is 3811.15 MU during 2020-21 against an APERC target of 3181.6 MU.
- Generation from Solar plant (5.4MW) at Polavaram is 7.44 MU and from Solar plant at Talaricheruvu (400 MW) is 740.06 MU.
- Annual Overhaul of all Thermal Units (7 units of Dr.NTTPS and 6 units of RTPP) was carried out in 2020-21 Loss of generation due to overhauls is about 1854.86 MU.
- About 15724.02 MU was backed down at thermal stations as per the instructions of Load Dispatch Centre.
- Thermal power stations have recorded the highest daily generation of 71.043 MU on 15.04.2020.
- Hydel stations have recorded the highest daily generation of 26.700 MU on 19.08.2020.
- Solar generation has recorded highest daily generation of 2. 706 MU on 26.01.2021.
- APGENCO stations have recorded the highest daily generation of 88.857MU on16.03.2021.
- Dr. NTTPS has achieved 54.04% PLF and Rayalaseema TPS achieved 15.76% PLF. The PLF is low because of less demand in the grid due to COVID -19 PANDEMIC
- Thermal stations have achieved 88.16% deemed PLF (Dr. NTTPS — 88.48% & RTPP- 87.82%).
PERFORMANCE HIGHLIGHTS FOR 2019-20
- APGENCO has achieved annual generation of 21597 MU.
- Thermal power stations (Dr NTTPS & RTPP) have achieved annual generation of 17469.02 MU.
- Thermal power stations (Dr NTTPS & RTPP) have achieved 58.48% (excluding RTPP IV is 66.76% PLF).
- Generation from Hydro power stations is 3425.00 MU during 2019-20 against target of 3181.6 MU.
- Generation from Solar plant (5.4 MW) at Polavaram is 8.07 MU and from Solar plant at Talaricheruvu (400 MW) is 694.98 MU.
- Thermal power stations have recorded the highest daily generation of 69.086 MU on 17.04.2019
- Hydel stations have recorded the highest daily generation of 25.407 MU on 30.10.2019
- Solar generation has recorded highest daily generation of 2.903 MU on 03.05.2019
- APGENCO has recorded the highest daily generation of 78.142 MU on 04.03.2020
- Dr. NTTPS has achieved 71.55% PLF and Rayalaseema TPS achieved 44.21% PLF. Thermal stations achieved 76.32% deemed PLF (Dr. NTTPS – 82.67% & RTPP – 69.55%)
PERFORMANCE HIGHLIGHTS FOR 2018-19
- APGENCO has achieved annual generation of 20433 MU
- Thermal power stations (Dr NTTPS & RTPP) have achieved annual generation of 17521.67
- Thermal power stations (Dr NTTPS & RTPP) have achieved 58.67% PLF (excluding RTPP IV is 66.76%PLF)
- Generation from Hydro power stations is 2750.44 MU during 2018-19 against target of 3313.1 MU
- Generation from Solar plant (5.4 MW) at Polavaram is 8.04 MU and from Solar plant at Talaricheruvu (400 MW) is 132.85 MU.
- Thermal power stations have recorded the highest daily generation of 70.83 MU on 04.09.2018.
- Hydel stations have recorded the highest daily generation of 27.57 MU on 31.08.2018
- Solar generation has recorded highest daily generation of 2.46 MU on 17.03.2019.
- APGENCO has recorded the highest daily generation of 92.80 MU on 09.09.2018.
- Dr. NTTPS has achieved 70.62% PLF and Rayalaseema TPS achieved 45.92% PLF.
- Thermal stations have achieved 72.28% deemed PLF (Dr. NTTPS – 82.64% & RTPP – 61.22%)
PERFORMANCE HIGHLIGHTS FOR 2017-18
- APGENCO achieved annual generation of 20463.8 MU
- Thermal power stations (Dr. NTTPS & RTPP) achieved annual generation of 17746.1 MU
- Thermal power stations (Dr. NTTPS & RTPP) achieved 71.5% PLF.
- Hydro power stations achieved annual generation of 2709.6 MU.
- Generation from Solar plant is 8.0 MU.
- Thermal power stations achieved highest daily generation of 65.223 MU on 14.03.2018.
- Hydel stations have achieved highest daily generation of 24.794 MU on 10.10.2017.
- Solar generation has recorded highest daily generation of 0.0326 MU on 26.02.2018.
- APGENCO units achieved highest daily generation of 78.049 MU on 13.03.2018.
- Dr. NTTPS achieved 70.2% PLF and Rayalaseema TPS achieved 73.7% PLF.
- Thermal stations achieved 80.26% deemed PLF (Dr. NTTPS – 76.89% & RTPP – 85.88%)
PERFORMANCE HIGHLIGHTS FOR 2016-17
- APGENCO achieved annual generation of 20708.8 MU.
- Thermal power stations (Dr. NTTPS & RTPP) achieved annual generation of 18366.7 MU.
- Thermal power stations (Dr. NTTPS & RTPP) achieved 74.61% PLF.
- Hydro power stations achieved annual generation of 339.1 MU.
- Thermal power stations achieved highest daily generation of 65.73 MU on 05.04.2016.
- Hydel stations achieved highest daily generation of 23.64 MU on 26.09.2016.
- Solar generation achieved highest daily generation of 0.031 MU on 03.03.2017.
- APGENCO achieved highest generation of 79.13 MU on 22.08.2016.
- Dr. NTTPS achieved 75.6% PLF and Rayalaseema TPS achieved 73.0% PLF.
- Thermal stations have achieved 88.8% deemed PLF (Dr NTTPS - 86.3% & RTPP - 92.8%).
PERFORMANCE HIGHLIGHTS FOR 2015-16
- APGENCO has achieved annual generation of 21830 MU
- Thermal power stations (Dr NTTPS & RTPP) have achieved annual generation of 19359 MU
- Thermal power stations (Dr NTTPS & RTPP) have achieved 78.43% PLF
- Generation from Present Hydro power stations is 2471 MU
- Overhaul of 9 Nos Thermal Units (2810 MW) got completed during 2015-16. Loss of generation due to overhauls is about 1204MU.
- About 2316 MU was backed down at thermal stations as per the instructions of Load Dispatch Centre during 2015-16.
- Thermal power stations have recorded the highest daily generation of 65.27 MU on 02.04.2015
- Hydel stations have recorded the highest daily generation of 13.41 MU on 03.11.2015
- Dr NTTPS has achieved 78% PLF and Rayalaseema TPS achieved 79% PLF.
- Thermal stations have achieved 87.81% deemed PLF (Dr NTTPS - 86.61% & RTPP - 89.82%).
PERFORMANCE HIGHLIGHTS FOR 2014-15
- APGENCO contribution to AP power grid is 21957.74 MU (54.3 %)
- AP Power grid handled total annual energy of 40413.63 MU
- Maximum Daily energy handled by AP power grid is 153.94 MU on 26.03.2015
PERFORMANCE HIGHLIGHTS FOR 2013-14
- APGENCO has achieved annual generation of 41959 MU during 2013-14 (2nd highest).
- APGENCO contribution to AP Power grid is 38813 MU (43.8%)
- Thermal power stations have achieved annual generation of 34795 MU
- APGENCO Thermal power stations achieved 78% PLF against All India Average PLF of 65.6%.
- Generation from Hydro power stations is 7162 MU during 2013-14 against 3226 MU achieved during 2012-13 owing to good inflows into all major reservoirs.
- Srisailam reservoir received about 820 TMCft during 2013-14 against 196 TMCft during 2012-13.
- Solar PV unit established at Jurala by APGENCO has once again generated 1.7 MU during 2013-14 against guaranteed energy of 1.4 MU per annum.
-
A. Power Plants Performance Highlights:
- APGENCO& APPDCL have generated power generation of 28,526.43 MU.
- Thermal power stations (Dr NTTPS & RTPP) have generated power of 18,407.23 MU.
- Thermal power station (Dr NTTPS & RTPP) have achieved PLF 61.61%.
- Generation from Hydro power stations is 3741.90 MU against target of 3245.1 MU.
- Generation from Solar plant (5.4MW) at Polavaram is 7.168 MU and from Talaricheruvu Solar plant (400 MW) is 697.74 MU.
- About 3301.54 MU was backed down at thermal stations as per the instructions of Load Dispatch Centre.
- APGENCO Thermal power stations have recorded the highest daily generation of 69.456 MU on 08.04.2021.
- Hydel stations have recorded the highest daily generation of 26.532 MU on 11.10.2021.
- Solar generation has recorded highest daily generation of 2. 652 MU on 01.06.2021
- APGENCO has recorded the highest daily generation of 90.652 MU on 07.08.2021.
- Dr. NTTPS has achieved 75.18% PLF and Rayalaseema TPS achieved 47.14% PLF.
- Thermal stations have achieved 72.66?emed PLF (Dr. NTTPS:79.05% & RTPP: 65.84%).