ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED
VIDYUT SOUDHA  ::  Vijayawada - 520004
Daywise Generation Particulars as on  :  07-04-2020
Station Unit Capacity Daywise generation in MU 1st to 7th Apr 1st Apr to 7th Apr
(MW) 05-04-20 06-04-20 07-04-20 Gen (MU) PLF (%) Gen (MU) PLF (%)
Thermal Power Stations                
Dr.Narla Tatarao Unit 1 210.0 3.93 4.12 4.00 28.41 80.53 28.41 80.53
(Vijayawada) Unit 2 210.0              
  Unit 3 210.0 4.23 4.59 4.34 31.26 88.61 31.26 88.61
  Unit 4 210.0 4.20 4.46 4.23 30.26 85.77 30.26 85.77
  Unit 5 210.0              
  Unit 6 210.0              
  Unit 7 500.0              
  Station 1760.0 12.36 13.17 12.57 89.93 30.41 89.93 30.41
Rayalaseema Unit 1 210.0              
  Unit 2 210.0              
  Unit 3 210.0 3.76 4.43 4.11 28.33 80.29 28.33 80.29
  Unit 4 210.0              
  Unit 5 210.0              
  Unit 6 600.0              
  Station 1650.0 3.76 4.43 4.11 28.33 10.22 28.33 10.22
APGENCO Thermal 3410.0 16.12 17.60 16.68 118.26 20.64 118.26 20.64
Hydro Power Stations                
Machkund (AP Utilisation) 84.0 1.02 0.84 0.73 6.41   6.41  
Tungabhadra (AP Utilisation) 57.6 0.33 0.33 0.35 2.40   2.40  
Upper Sileru 240.0 3.04 3.00 2.38 19.96   19.96  
Donkarayi 25.0 0.22 0.23 0.20 1.52   1.52  
Lower Sileru 460.0 3.09 3.37 2.81 21.17   21.17  
Srisailam Right 770.0 0.49 0.30 0.25 1.35   1.35  
NS Right Canal 90.0              
NS Tail Pond Dam   50.0              
Penna Ahobilam 20.0              
Chettipeta Mini Hydro 1.0              
APGENCO Hydro 1797.6 8.20 8.07 6.73 52.82   52.82  
 Solar plant at polavaram 5.4 0.03 0.02 0.02 0.18 20.06 0.18 20.06
Solar plant at Talaricheruvu 400.0 2.34 1.91 2.14 16.14 24.02 16.14 24.02
APGENCO Solar 405.4 2.37 1.94 2.16 16.32 23.97 16.32 23.97
APGENCO Total 5613.0 26.70 27.61 25.57 187.40   187.40  
                   
Machkund (Total) 120.0 1.99 1.76 1.59 12.99   12.99  
Tungabhadra (Total) 72.0 0.44 0.43 0.46 3.00   3.00  
APPDCL                  
Total SDSTPS station 1600.0 14.32 14.56 13.76 98.24 36.55 98.24 36.55
Outage of Thermal Units
RTPP 1 (210 MW) is kept under reserve stand by from 22:50 on 04.03.2020
RTPP 2 (210 MW) is kept under reserve stand by  from 20:47 on 22.02.2020
RTPP 4 (210 MW) is kept under reserve stand by from 19:24 on 01.03.2020
RTPP 5 (210 MW) is kept under reserve stand by from  00:00 on 21.02.2020
RTPP 6 (210 MW) is kept under reserve stand by from  23:30 on 25.03.2020
DrNTTPS 2 (210 MW) is kept under reserve stand by from  23:30 on 22.03.2020
DrNTTPS 5 (500 MW) is kept under reserve stand by from 09:00 on 26.03.2020
DrNTTPS 6 (210 MW) is kept under reserve stand by from  01:12 on 23.03.2020
DrNTTPS 7 (500 MW) is kept under reserve stand by from 00:00 on 23.03.2020
Outage of Hydro Units
Machkund 5 (23 MW) is under outage due to GT problem  from 03:45 on 20.03.2020
Machkund 1 (17 MW) is under outage due to oil motor problem  from 10.35 on 06.04.2020
Upper Sileru 1(60 MW) is under outage due to AVR panel rectification works from 10:39 on 05.03.2020
Outage of SDSTPS Units
SDSTPS 2 (800MW) is kept  unde Reserve Stand by from 00:00 on 23.03.2020