| Performance Highlights of 2004-05 |
|
- APGENCO Achieved Top Position Among Power Utilities in All India PLF Rankings.
|
- Highest PLF of 89.7% achieved by APGENCO since inception (1965).
|
- Highest thermal generation 23360 MU achieved by APGENCO since inception (1965).
|
- KTPS Stg V stood FIRST with a PLF of 94.5% amongst all thermal power stations in the country.
|
- KTPS O&M achieved highest generation 5364 MU and highest PLF of 87.5% since inception (1966).
|
- VTPS achieved all time high daily generation 31 MU and highest daily PLF of 102.5% on 31-03-2005 since inception (1979).
|
- Ramagundam Thermal Station achieved 90.6% PLF, highest in the last 27 years (after 1977-78)
|
- Highest daily Thermal generation 72.03 MU achieved on 18-11-2004 since inception (1965)
|
- Highest daily Hydel generation 50.52 MU achieved on 26-08-2004 since inception (1955)
|
- Highest daily APGENCO total generation 109.64 MU achieved on 27-08-2004 since inception (1955)
|