KTPS – O&M – A&P – S&S – CS- I, II & III – Cleaning of Central stores sheds, surrounding areas, material and removing of dust/cobwebs from the spare racks, floor, walls and bottoms of steel structures of CS- I, II & III and Jungle cutting in Scrap Yard of CS-I for the year 2014-15
S200001001 SE/A&P/KTPS(O&M)
entral stores sheds, surrounding areas, material and removing of dust/cobwebs from the spare racks, floor, walls and bottoms of steel structures of CS- I, II & III and Jungle cutting in Scrap Yard of CS-I for the year 2014-15
 
KTPS – O&M – A&P – S&S – GS – Annual Maintenance of Split & Window type Air – Conditioners and Water & Air coolers of CD-I & II sections for the year 2014 -15
S200000998 SE/A&P/KTPS(O&M)
t & Window type Air – Conditioners and Water & Air coolers of CD-I & II sections for the year 2014 -15
 
KTPS – O&M – A&P – S&S – GS – Rectification of Certain Minor Electrical complaints in ‘B’ , ‘Ash’, and Security Colonies, Hospital and offices of CD-II section for Financial Year 2014-15.
S200000999 SE/A&P/KTPS(O&M)
inor Electrical complaints in ‘B’ , ‘Ash’, and Security Colonies, Hospital and offices of CD-II section for Financial Year 2014-15.
 
KTPS – O&M – A&P – S&S – GS – Repairs and Refixing of 70/150/250/400 W SV lamps and 40W tube light fittings, Load balancing of DTR’ s Minor repairs and Shifting of DTR’ s and branches , bushes and tree cutting in Colony Distribution-II section for the Financial Year 2014-15.
S200001000 SE/A&P/KTPS(O&M)
/150/250/400 W SV lamps and 40W tube light fittings, Load balancing of DTR’ s Minor repairs and Shifting of DTR’ s and branches , bushes and tree cutting in Colony Distribution-II section for the Financial Year 2014-15.
 
KTPS – O&M – A&P – S&S – GS – Rectification of Certain Minor Electrical complaints in ‘A’ , ‘IM’, ‘C’, and Old Bombay Colonies in CD-I section for the FY 2014-15
S200000969 SE/A&P/KTPS(O&M)
inor Electrical complaints in ‘A’ , ‘IM’, ‘C’, and Old Bombay Colonies in CD-I section for the FY 2014-15
 
Repairs and Refixing of 70/150/250/400 W SV lamps ,and 40W tube light fittings, Load balancing of DTRs and Minor repairs and Shifting of DTRs and branches, bushes and tree cutting in Colony Distribution-I for the FY 2014-15.
S200000970 of SE/A&P /KTPS(O&M)
0W tube light fittings, Load balancing of DTRs and Minor repairs and Shifting of DTRs and branches, bushes and tree cutting in Colony Distribution-I for the FY 2014-15.
 
KTPS-VI stage-1x500MW- Providing water proofing treatment and laying screed concrete for roof slab at 31.75M LVL of BC bay and filling joints/cracks with Polyurethane sealant and APP membrane felt at joints for 37.00M LVL roof slab of AB bay of STG building of KTPS VI stage, Paloncha, Khammam Dist
e-72/CE/Civil/Thermal Projects and O&M-II/APGENCO/ 2014-15, Dt. 22.04.2014
>

Schedule Closing Date &Time : 16.04.2014, 4.30 PM

Bid Submission closing Date & time : 16.04.2014, 5.00 PM


Chief Engineer/ Civil/Thermal Projects and O&M-II

 
KTPS-C-BM-III-Emptying of chocked up ash from ESP hoppers and rectification of ESP Fields and other related miscellaneous works at units 7 & 8 during the year 2014 - 15.
T.N.No.S200001021 /SE/O&M/C-STN /KTPS/14-15; Dt.21/04/2014
>KTPS-C-BM-III-Emptying of chocked up ash from ESP hoppers and rectification of ESP Fields and other related miscellaneous works at units 7 & 8 during the year 2014 - 15.
 
KTPS-C-BM-III-Removal, collection and transportation of hardened ash inside the hydro sluice trench, drain sump, intermediate slurry sump and old ash slurry disposal pipe line trench during the year 2014 - 15.
T.N.No.S200001020/SE/O&M/C-STN /KTPS/14-15; Dt.21/04/2014
>KTPS-C-BM-III-Removal, collection and transportation of hardened ash inside the hydro sluice trench, drain sump, intermediate slurry sump and old ash slurry disposal pipe line trench during the year 2014 - 15.
 
KTPS-C-BM-III-Emptying of accumulated coarse ash from economizer hoppers and water flushing at Ash Plant area of the unit-7 & 8 / KTPS - C during the year 2014-15..
T.N.No.S200001017 /SE/O&M/C-STN /KTPS/14-15; Dt.21/04/2014
>KTPS-C-BM-III-Emptying of accumulated coarse ash from economizer hoppers and water flushing at Ash Plant area of the unit-7 & 8 / KTPS - C during the year 2014-15.
 
KTPS-C-BM-III-Replacement of worn out 200mm dia fly ash transport pipes, bends, segregating valves, wetting head tail pipes and other miscellaneous works at units 7&8 during the year 2014-15.
T.N.No.S200001016 /SE/O&M/C-STN /KTPS/14-15; Dt.21/04/2014
>KTPS-C-BM-III-Replacement of worn out 200mm dia fly ash transport pipes, bends, segregating valves, wetting head tail pipes and other miscellaneous works at units 7&8 during the year 2014-15.
 
KTPS-C- BM-III-Rectification / Replacement / Maintenance works at the ash disposal pipelines A,B and C of KTPS-C-Stn., during the year 2014-15.
T.N.No.S200001014 /SE/O&M/C-STN /KTPS/14-15; Dt.21/04/2014
>KTPS-C- BM-III-Rectification / Replacement / Maintenance works at the ash disposal pipelines A,B and C of KTPS-C-Stn., during the year 2014-15.
 
KTPS - " C " Station - BM - II - Design and fabrication of seal air fan shaft for modification of shaft mounted impeller to Plummer block with coupling including dynamic balancing of shaft with impeller during forthcoming capital / annual overhaul of unit -8.
T.N.No.S200001012 /SE/O&M/C-STN /KTPS/14-15; Dt.21/04/2014
>KTPS - " C " Station - BM - II - Design and  fabrication of seal air fan shaft for modification of shaft mounted impeller to Plummer block with coupling including dynamic balancing of shaft with impeller during forthcoming capital / annual overhaul of unit -8.
 
KTPS-C-BM-I-Arresting of heavy feed water /steam leak using on line sealing techniques at units 7&8 as preventive maintenance during the year 2014-15
T.N.No.S200001011 /SE/O&M/C-STN /KTPS/14-15; Dt.21/04/2014
>KTPS-C-BM-I-Arresting of heavy feed water /steam leak  using on line sealing techniques at units 7&8 as preventive maintenance during the year 2014-15
 
KTPS-Residual Life Assessment (RLA) / Life Extension (LE) Study of 60 MW Boiler in Unit-1 of A–Station of Kothagudem Thermal Power Station (KTPS), Paloncha- 507 115, Khammam (D.t).
Tender notice No-CEG-I/EME (R&M)/ KTPS (O&M)/Unit No 1/ RLA Study/


Schedule Closing Date &Time : 16.00 hrs on 12.05.2014

Bid Submission closing Date & time :16.00 hrs on 19.05.2014


SUPERINTENDING ENGINEER (R&M)

 
KTPS-O&M-Replacement of damaged hot water distribution system of both cooling tower No.7&8 with 160 mm dia UPVC pipes and nozzle assembly at Paloncha, Khammam Dist
Tender notice No-e-47/CE/Civil/Thermal/APGENCO/2013-14. Dt. 03/12 /2013
>> Dates Amended <

Schedule Closing Date &Time :
28.04.2014, 4.30 PM

Bid Submission closing Date & time : 28.04.2014, 5.00 PM


CHIEF ENGINEER / CIVIL/ THERMAL Projects and O&m-II

 